PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

2nd floor bathroom roughing Facing South.jpg Continued installing copper piping at the 1st floor Bathrooms 133-136 Facing North-West.jpg Electrical wires for the 2nd Floor VAV boxes Facing North.jpg Electrical wires for the 3rd floor VAV boxes Facing East.jpg Erecting the stone panels at the North Elevation.jpg Installed rebar at the detention cells Facing West.jpg Installing copper piping at the 2nd floor Bathroom Facing South.jpg Installing ductwork fitters at the 3rd floor Facing West.jpg
Previous pageNext page Electrical wires for the 3rd floor VAV boxes Facing East
Electrical wires for the 3rd floor VAV boxes Facing East